Sudaryanti, Vina (2019) MANAJEMEN PROYEK DI DEALER HONDA NON MSO (MITRA SALES OPERATION) PADA PT BESMART SURABAYA. Diploma thesis, Politeknik NSC Surabaya.
![]() |
Text
Halaman Awal.pdf Download (1MB) |
![]() |
Text
Daftar Isi.pdf Download (406kB) |
![]() |
Text
Abstrak.pdf Download (179kB) |
![]() |
Text
BAB I.pdf Download (231kB) |
![]() |
Text
BAB II.pdf Download (502kB) |
![]() |
Text
BAB III.pdf Restricted to Repository staff only Download (3MB) |
![]() |
Text
BAB IV.pdf Download (108kB) |
![]() |
Text
Daftar Pustaka.pdf Download (108kB) |
Abstract
The writing of this thesis aims to explain how project management is at the Honda non mso dealer at PT Besmart Surabaya. The research method in writing this final assignment uses descriptive qualitative method with data collection techniques through direct observation, interviews and documentation. Research shows that project management at Honda non mso dealers at PT Besmart
Surabaya has improved the Reception project, Production is going well because it is done with good teamwork, but there are still some obstacles that lead to project
unrest.
Keywords : procedures, billing, sales facto
Item Type: | Thesis (Diploma) |
---|---|
Subjects: | H Social Sciences > H Social Sciences (General) H Social Sciences > HZ Business Administration |
Divisions: | Business Administration |
Depositing User: | Mrs Duanita Riyannestiti |
Date Deposited: | 09 Jul 2020 06:55 |
Last Modified: | 09 Jul 2020 06:55 |
URI: | http://repository.nscpolteksby.ac.id/id/eprint/342 |
Actions (login required)
![]() |
View Item |